Some rewarding floor transformations begin under an old carpet. In an earlier Hampstead project, Max-FS exposed pine boards and repaired them before preparing a new finish.
See what the covering concealed
Fixings, worn edges, small holes and previous alterations can become visible once the carpet is removed. The aim is to retain sound timber where possible while addressing the areas that prevent a stable, consistent surface.
Repair before refinishing
The Hampstead project used reclaimed timber slivers for local repairs. Matching the species and character helps a repair sit comfortably among older boards, although old and new material may take colour differently. Gap treatment also needs to allow for normal movement; not every gap should be handled in the same way.
Choose a suitable finish
The archived floor was sanded, stained to the selected tone and protected with a satin coating. A comparable project today still needs its own assessment of timber depth, condition and finishing compatibility. Before replacing boards beneath a carpet, ask Max-FS whether their existing character can be restored.
Updated Max-FS journal guidance. Archived project references describe earlier work; generated images are illustrative. The appropriate treatment depends on the actual floor and finish.